Production Performance Brief
Compare supplier capacity claims using the same bottle, production window and accepted finished-unit count. One large BPH number is not an output commitment.
Direct answer
Review point 01
This is an illustrative calculation, not a quoted machine result. Start with an 8-hour planned production window and a 6,000 BPH ideal line rate. If recorded downtime is 1 hour, running performance is 96% and yield is 99%, gross output is 6,000 × 7 × 0.96 = 40,320 bottles. Accepted output is 40,320 × 0.99 = 39,916.8 bottles-equivalent, approximately 39,917.
Review point 02
A bottle leaving the filler may still fail a label check, be held for inspection or never become a complete pack. Count at the agreed accepted-bottle or accepted-pack boundary and reconcile intermediate inventory. Do not convert all filled bottles into saleable packs when incomplete groups remain.
Review point 03
A 30-minute uninterrupted demonstration and an 8-hour connected trial cannot be compared as though they were the same evidence. Ask whether sanitation, changeover, material replenishment, breakdowns and restart are inside the reported window.
Review point 04
Before approval, write the reference SKU, agreed accepted count, duration, utilities, materials and allowed interventions into the performance specification. Define who records each count and how a failed test is handled. Do not replace a negotiated acceptance clause with an online calculator result.
Catalog equipment evidence
These Allot Tech catalog references connect the technical explanation to physical equipment. Each caption identifies the capacity, interface or acceptance evidence to confirm.
Separate water preparation, bottle supply, filling, decoration and packing, then compare every node on one output basis.
Review this interface basisSource: Allot Tech Beverage Bottling Catalog 2026. Images are representative equipment references; final models and configurations remain project-specific.
Output claim normalization
Rated speed, observed running speed, sustained connected output and accepted saleable output answer different questions. A proposal or test record should label each number and preserve the reference bottle, time window and counting point.
Use this to identify a model and reference format. It does not include upstream starvation, downstream blockage, material replenishment, connected recovery or line-end quality loss unless the proposal expressly says so.
Measure the equipment running together for an agreed window. Record planned interventions, stops, utility conditions and whether the line recovered its normal buffer state before the window closed.
Reconcile gross counts, rejected bottles, held product and accepted packs at the agreed boundary. This is the number that should support shift planning and a complete-line performance decision.
Minimum evidence set
Questions before specification
Answers are planning guidance. Project requirements and performance remain subject to confirmed data and agreements.
Not if that rate already includes the same downtime, speed and quality losses. Applying the factors again double-counts them.
Yes. They may use different bottles, time windows, included machines, utility conditions and rejection rules. Compare connected accepted output on one basis.
No. The percentages and time losses are declared assumptions for explaining the calculation. A project result needs measured records and agreed conditions.