WATER BOTTLING LINE — OUTPUT TEST RECORD Publisher: Allot Tech (Suzhou) Co., Ltd. Blank planning aid, revision 2026-09-22. Not a certificate, standard, guaranteed rate or contractual acceptance. No result is pre-approved. Use the project-approved procedure and criteria. Qualified personnel only; never bypass safety functions. 1. IDENTITY AND AGREED BASIS Test ID / date / location: Protocol revision / requirement ID: Reference bottle / closure / label / complete pack: Product or test medium / material lot IDs: Connected equipment boundary / retained machines: Absent equipment / substitutions / simulated signals: Required accepted output / agreed duration / quality criteria: Permitted interventions / pre-agreed time exclusions: Approved procedure / authorized witnesses: 2. CLOCK AND RAW COUNTERS Common clock / time zone: Start timestamp / end timestamp / total elapsed hours: Pre-agreed exclusions with reasons (report separately): Counter ID / physical position / unit: Initial reading / final reading / difference: Reset or rollover / correction / supporting raw evidence: Bottles per complete pack if conversion is needed: 3. UNIT MOVEMENTS — SAME PHYSICAL BOUNDARY AND WINDOW Opening work-in-process, bottle equivalents: Units admitted: Accepted units leaving: Rejected units removed: Held units removed to quarantine outside the boundary: Closing work-in-process: Other documented movements in / out: Reconciliation residual: Balance: opening WIP + admitted + other in = accepted out + rejects out + held out + closing WIP + other out. Keep categories mutually exclusive. Held units still inside the boundary must not also be counted as removed. Accepted bottles per elapsed hour = accepted units leaving / agreed elapsed hours. Show the actual time basis; do not silently remove stops or report a short burst as full-window performance. 4. EVENT AND CONDITION LOG — REPEAT ROW AS NEEDED Event ID / start / finish: Initiating machine / affected states: Observed cause / confidence / unknown items: Intervention or setting change: Accepted-output recovery time: Utilities and material conditions: Quality disposition / evidence file reference: 5. REQUIREMENT RESULT AND OPEN ITEMS — REPEAT ROW AS NEEDED Requirement ID / agreed criterion: Observed result / evidence reference: Status: record demonstrated, failed, not tested or conditional as supported; do not preselect a pass. Unexplained difference / deviation: Responsible person / corrective action / due date: Retest conditions / closure evidence: Record prepared by / authorized review / date: Remaining scope limitations: Keep raw evidence with this record. Redact confidential or personal information before sharing. The website form accepts PDF and supported images, not TXT. Paste a short non-confidential summary or export to an accepted format. Guide: https://waterbottlingproductionline.com/performance-test-data-sheet/